Voltage Drop

Check a cable run against the allowable drop

Design data
V
A
m
Settings & basis
ResultPreliminary · verify before design
Voltage drop2.04 %8.15 V over 85 m
Within limitWithin 4 % limit
Conductor resistance at 90 °C (IEC 60228)0.493 mΩ/m
Reactance (assumed)0.08 mΩ/m
Drop per amp per metre0.80 mV/A/m
Voltage at load391.8 V
Max length at this current167 m

Preliminary check. Confirm with the manufacturer's mV/A/m data.

What to verify before design ↓

Verify before using in design

  • Use the manufacturer's mV/A/m values for the actual cable.
  • At part load the conductor runs cooler, so the real drop is a little lower than shown.
  • The % drop is of the line-to-line voltage for 3-phase and of the line-to-neutral voltage for 1-phase.
  • Check motor starting dips and the limit in the project specification or utility rules.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.1 · Nov 2026Basis last checked: Nov 2026✓ Tested against worked examples✓ Reviewed by an electrical engineer · Nov 2026

Formula

ΔV = k · I · L · (R cos φ + X sin φ) k = √3 (3-ph) or 2 (1-ph)

Standards and references

  • IEC 60364-5-52:2009, Annex G
  • BS 7671:2018+A3:2024, Appendix 4
  • NFPA 70 (NEC) 2023, informational notes to 210.19 and 215.2

Assumptions

  • Conductor resistance from IEC 60228 (maximum DC value at 20 °C, stranded class 2), corrected to the selected operating temperature: 90 °C for XLPE/EPR, 70 °C for PVC. This matches the r values in the BS 7671 Appendix 4 tables.
  • Reactance 0.08 mΩ/m, typical for multicore cables.
  • Balanced load, steady state; harmonics and motor starting ignored.

Inputs and units

System—
Nominal voltageV100–1000
Design currentA0.5–4000
Route lengthm1–1000
Conductor sizemm²
Material—
Power factor0.6–1
Conductor temperature—
Code / limit basis—

Typical range: last column

Worked example (default values)

  • System3-phase
  • Nominal voltage400 V
  • Design current120 A
  • Route length85 m
  • Conductor size50 mm²
  • MaterialCopper
  • Power factor0.85
  • Conductor temperature90 °C · XLPE / EPR (thermosetting)
  • Code / limit basisProject specification · 4 %
Voltage drop2.04 %Within 4 % limit