Templates

Ready formats for daily site work

Open a template, copy it, and paste it into Word, Excel or an email.

Excel sheets for site and design work

Each workbook has a blank sheet, a completed SAMPLE and a How-to-use tab. Fields marked project-defined follow your contract.

Free · PDF

Site Engineer's Quick Reference

Two A4 pages to print or keep on your phone: power formulas, fault level, MCB curves, cables, motors, ELV, submittal codes, FIDIC notices, permits, heat rules, concrete basics.

2 A4 pages · English and Arabic · edition Nov 2026 · preliminary, check your contract and specification

Free

PPM Schedule & Compliance Tracker

PPM tasks by asset with next due date, overdue flags and monthly on-time compliance

  • How to use
  • PPM schedule
  • PPM schedule (SAMPLE)
  • Monthly compliance
  • Monthly compliance (SAMPLE)

Excel (.xlsx) · version 1.0 · revised 12 Nov 2026 · blank template with a filled sample · check it against your project specification

Free

Store Material Register

Item list with live stock balance and reorder flags, a stock movement log, and a sub-store receiving note for material from the main store

  • How to use
  • Item list
  • Stock movements
  • Receiving from main store
  • Item list (SAMPLE)
  • Stock movements (SAMPLE)
  • Receiving from main (SAMPLE)

Excel (.xlsx) · version 1.0 · revised 12 Nov 2026 · blank template with a filled sample · check it against your project specification

Free

Asset Register

Every maintainable asset with location, maker data, warranty, criticality and replacement year

  • How to use
  • Asset register
  • Asset register (SAMPLE)

Excel (.xlsx) · version 1.0 · revised 12 Nov 2026 · blank template with a filled sample · check it against your project specification

Free

Material Receiving Inspection Record

MIR form, receiving checks and an MIR log with overdue flags

  • How to use
  • MIR form
  • MIR form (SAMPLE)
  • MIR log

Excel (.xlsx) · version 1.1 · revised 7 Nov 2026 · blank template with a filled sample · check it against your project specification

Free

Submittal & RFI Tracker

Two registers with status codes, due dates, days open and overdue flags

  • How to use
  • Submittal register
  • RFI register

Excel (.xlsx) · version 1.1 · revised 7 Nov 2026 · blank template · check it against your project specification

Free

NCR & Corrective Action Log

NCR form with root cause and corrective action, plus a log with overdue flags

  • How to use
  • NCR form
  • NCR form (SAMPLE)
  • NCR log

Excel (.xlsx) · version 1.1 · revised 7 Nov 2026 · blank template with a filled sample · check it against your project specification

Free

Drawing Register & Transmittal Log

Every revision with status, LATEST / SUPERSEDED flags, and transmittals with overdue replies

  • How to use
  • Drawing register
  • Transmittal log

Excel (.xlsx) · version 1.1 · revised 7 Nov 2026 · blank template · check it against your project specification

Free

Punch List & Snag Tracker

Snags by category and status with overdue flags, and a summary that shows whether category A items still block handover

  • How to use
  • Punch list
  • Summary

Excel (.xlsx) · version 1.1 · revised 7 Nov 2026 · blank template · check it against your project specification

Free

Daily Site Report & 3-Week Lookahead

One-page daily report, manpower log with histogram, and a 3-week lookahead that shows which tasks are ready

  • How to use
  • Daily report
  • Manpower log
  • 3-week lookahead

Excel (.xlsx) · version 1.1 · revised 7 Nov 2026 · blank template · check it against your project specification

Free

BOQ & Quantity Takeoff

Dimension sheet that feeds a priced BOQ, with bill summary, contingency and VAT

  • How to use
  • Takeoff
  • BOQ
  • Summary

Excel (.xlsx) · version 1.1 · revised 7 Nov 2026 · blank template · check it against your project specification