Checklists

Site checklists

Tick items as you go. Your progress is saved in this browser.

Generator Weekly & Monthly Run11 items · Standby generator checks and the monthly load run (NFPA 110)UPS & Battery Inspection10 items · Routine checks that keep the UPS and its batteries readyFire Alarm Weekly & Periodic Tests10 items · User tests and servicing for the fire alarm system (BS 5839-1 / NFPA 72)Fire Pump Weekly Run9 items · Churn test and checks for diesel and electric fire pumps (NFPA 25)LV Panel Thermography & Inspection10 items · Infrared survey and visual checks of switchboards in serviceWater Tanks & Legionella Control10 items · Routine water hygiene checks for building water systems (HSG274)Pre-pour Concrete13 items · Before every slab, beam or column pourLV Panel Energisation13 items · Before switching on a new boardInspection Readiness8 items · Before raising an inspection requestHandover Readiness10 items · Before offering an area for handoverWork at Height Pre-start8 items · Daily check before working above groundCombined Services Drawing Sign-off11 items · Before a zone is released for MEP installationMEP Shop Drawing Review10 items · Before submitting a shop drawing for approvalAuthority Approvals at Project Start11 items · Registrations, permits and approvals to line up in the first monthWeekly Environmental Inspection12 items · Walk-round check against the CEMP and permitsFuel & Chemical Storage10 items · Set-up and weekly check of fuel tanks and chemical storesSprinkler System Pre-commissioning10 items · Before inviting civil defence to witnessClean Agent Room Readiness10 items · Before the integrity test and system armingUnitised Panel Installation11 items · Before and during hanging façade panels on a floorSite Water Hose Test (AAMA 501.2)8 items · Field check of installed façade joints for water leaksVariation Submission Check10 items · Before sending a variation quotation or claimGreen Rating Evidence on Site10 items · Monthly check of construction-stage credit evidenceSetting-out Check10 items · Before handing setting-out marks to the tradesSurvey Instrument Checks10 items · Daily and periodic checks on levels, total stations and GNSSTask Make-ready Check10 items · Before a task goes into next week's planDaily Heat Stress Controls11 items · Every summer working dayInstrument Loop Check11 items · For each loop, from field device to operator screenBMS Commissioning11 items · Before handing over the building management systemSnagging Walk-down11 items · Before inviting the consultant to inspect an areaO&M Manual Review11 items · Before submitting an O&M manual for approvalTest Pack Readiness10 items · Before a piping system is pressure testedEx Equipment Inspection10 items · Close inspection of equipment in a hazardous area (IEC 60079-17)Crane Pre-lift Checks12 items · On the day, before the first liftScaffold Inspection12 items · Weekly and after any change, storm or damageMV Cable Installation & Testing13 items · From drum to energisation of an MV cableTransformer Pre-energisation12 items · Before a distribution transformer is switched onGenerator Pre-commissioning10 items · Before first run of a standby generatorFiber Installation & Testing17 items · From cable pulling to test reportsFire Alarm Testing & Commissioning16 items · Before handing over a fire alarm systemCCTV Commissioning16 items · Cameras, recording and handoverAccess Control Commissioning15 items · Door by door before handoverStructured Cabling Testing11 items · Copper links before certificationPA / Voice Alarm Commissioning12 items · Speakers, amplifiers and messagesWater Main Pressure Test & Disinfection12 items · Before a new main is connected to the live networkGravity Sewer Installation & Testing11 items · Between two manholes, before final backfill and handoverAHU Pre-commissioning15 items · Before the first start of an air handling unitChiller Start-up Readiness13 items · Before the manufacturer starts a chillerAsphalt Paving Inspection12 items · Before, during and after laying each asphalt layerSubgrade / Sub-base Layer Approval9 items · Before covering a compacted earthworks or granular layerExcavation Daily Inspection12 items · Before anyone enters an excavation