Cable Sizing

Smallest copper XLPE cable for a design current

Design data
A
Settings & basis
ResultPreliminary · verify before design
Selected size70 mm²4-core Cu XLPE on perforated tray · 160 A device
Within limitIb 150 A ≤ In 160 A ≤ Iz 175 A
Protective device In160 A
Combined derating factor0.713
Required tabulated rating224 A
Tabulated rating of selection246 A
Derated capacity Iz175 A
Spare over In10 %

Tray in air only (IEC 60364-5-52 Method E). Buried cables (Method D) need different tables, ground temperature and soil resistivity factors. Sized so the cable is protected by the device (Ib ≤ In ≤ Iz). For fuses and some devices also check I2 ≤ 1.45 Iz. Check voltage drop and short-circuit withstand separately.

What to verify before design ↓

Verify before using in design

  • Check voltage drop (Voltage Drop calculator) and short-circuit withstand.
  • Buried cables, ducts and heavy harmonic loads need different tables and factors.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026✓ Tested against worked examples✓ Reviewed by an electrical engineer · Nov 2026

Formula

Ib ≤ In ≤ Iz It = In ÷ (Ca · Cg) Iz (table) ≥ It

Standards and references

  • IEC 60364-5-52:2009, reference method E (XLPE, copper, multicore)
  • IEC 60364-4-43 (overload protection, Ib ≤ In ≤ Iz)
  • BS 7671:2018+A3:2024, Appendix 4

Assumptions

  • Copper XLPE multicore cable in free air on perforated tray, 3 loaded conductors. Not valid for buried cables or ducts.
  • Ratings at 30 °C ambient, corrected by the selected temperature factor Ca (IEC 60364-5-52 Table B.52.14) and grouping factor Cg (Tables B.52.17 and B.52.20 for cables on trays).
  • The cable is sized on the protective device rating In, so that Ib ≤ In ≤ Iz (IEC 60364-4-43).

Inputs and units

Design currentA1–600
Ambient temperature—
Circuits grouped on tray—
Protective device rating In—

Typical range: last column

Worked example (default values)

  • Design current150 A
  • Ambient temperature45 °C
  • Circuits grouped on tray3 circuits
  • Protective device rating InAuto: next standard ≥ Ib
Selected size70 mm²Ib 150 A ≤ In 160 A ≤ Iz 175 A

Next steps

More Electrical calculators

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.