Earth Fault Loop Impedance (Zs)

Maximum Zs for an MCB and a check of the measured value

Design data
A
V
Ω
Settings & basis
ResultPreliminary · verify before design
Maximum Zs1.37 ΩLimit for the measured value: 1.09 Ω (80 % of maximum)
Within limitMeasured 0.85 Ω ≤ 1.09 Ω: disconnection in time
Instantaneous trip current Ia160 A
Prospective earth fault current (Uo ÷ Zs measured)271 A
Margin22 %

For final circuits in TN systems, 0.4 s disconnection at 230 V (IEC 60364-4-41). The 0.8 factor allows for conductors heating up during a fault (BS 7671 Appendix 3 rule of thumb). For fuses and other devices use the maker's or the standard's tables.

What to verify before design ↓

Verify before using in design

  • Measure Zs at the furthest point of each circuit with a calibrated tester; RCD-protected circuits may need a no-trip test mode.
  • For TT systems or long circuits where Zs is too high, add RCD protection as the standard allows.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026✓ Tested against worked examples✓ Reviewed by an electrical engineer · Nov 2026

Formula

Zs max = Cmin × Uo ÷ Ia Ia = 5 / 10 / 20 × In (type B / C / D)

Standards and references

  • IEC 60364-4-41 (protection against electric shock)
  • IEC 60364-6 (verification)
  • BS 7671:2018+A3:2024, Table 41.3 and Appendix 3
  • IEC 60898-1 (MCB tripping characteristics)

Assumptions

  • TN system, final circuit, 0.4 s disconnection; MCB instantaneous trip at 5, 10 or 20 × In.

Inputs and units

Device—
Rated current InA
Voltage to earth UoV100–400
Measured ZsΩ0.01–20
Voltage factor Cmin0.9–1
Allow for conductor heating—

Typical range: last column

Worked example (default values)

  • DeviceMCB type B (Ia = 5 In)
  • Rated current In32 A
  • Voltage to earth Uo230 V
  • Measured Zs0.85 Ω
  • Voltage factor Cmin0.95
  • Allow for conductor heatingYes: measured ≤ 0.8 × Zs max
Maximum Zs1.37 ΩMeasured 0.85 Ω ≤ 1.09 Ω: disconnection in time