Breaker Selection

Rating that protects the cable

Design data
A
A
Settings & basis
ResultPreliminary · verify before design
Breaker rating100 ACurve C · instantaneous trip 5–10 × In (MCB)
Within limitIb 85 A ≤ In 100 A ≤ Iz 110 A
TypeMCB up to 125 A, or MCCB
Margin over design current18 %
Margin below cable capacity9 %

Also check breaking capacity against the fault level, and I2 ≤ 1.45 Iz for overload protection.

What to verify before design ↓

Verify before using in design

  • Breaking capacity must exceed the fault level at the board: Icu (ultimate), and Ics (service) where the specification asks for it (IEC 60947-2). Use the Fault Current at Cable End calculator for the value at the board.
  • Check selectivity with upstream devices.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.1 · Nov 2026Basis last checked: Nov 2026✓ Tested against worked examples✓ Reviewed by an electrical engineer · Nov 2026

Formula

Ib ≤ In ≤ Iz (IEC 60364-4-43)

Standards and references

  • IEC 60364-4-43:2008 (Ib ≤ In ≤ Iz, I2 ≤ 1.45 Iz)
  • IEC 60898-1 / IEC 60947-2

Assumptions

  • Next standard rating at or above the design current.

Inputs and units

Design currentA
Cable capacity IzA
Load type—

Typical range: last column

Worked example (default values)

  • Design current85 A
  • Cable capacity Iz110 A
  • Load typeGeneral & small motors (C curve)
Breaker rating100 AIb 85 A ≤ In 100 A ≤ Iz 110 A

Next steps

More Electrical calculators

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.