Protection Selectivity
Selectivity (also called discrimination) means that when a fault occurs, only the protective device immediately upstream of it opens. The rest of the installation stays energised.
Methods
- Current selectivity: upstream device has a higher instantaneous setting than the fault current at the downstream device.
- Time selectivity: upstream device has an intentional short-time delay (needs adequate short-time withstand, Icw).
- Energy selectivity: current-limiting downstream devices let through too little energy to trip the upstream one.
- Zone selective interlocking (ZSI): breakers communicate so the one nearest the fault trips without delay.
In practice
- Use the manufacturer's selectivity tables. They state total or partial selectivity up to a given fault current.
- Partial selectivity is only valid up to the stated limit current; above it both devices may trip.
- Plot time-current curves in ETAP or the maker's software for MV and main LV levels.