Lighting Lumen Method

Number of luminaires for a target lux

Design data
m
m
lux
lm
W
ResultPreliminary · verify before design
Luminaires required2525.00 calculated
Room area96.0 m²
Maintained lux with 25 fittings500 lux
Total load900 W
Lighting power density9.4 W/m²

Confirm uniformity and glare with a DIALux model.

What to verify before design ↓

Verify before using in design

  • Model in DIALux / Relux to check uniformity (Uo) and glare (UGR).
  • Emergency lighting is a separate design (EN 1838 / BS 5266-1).
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026✓ Reviewed by an electrical engineer · Nov 2026

Formula

N = (E · A) ÷ (Φ · UF · MF)

Standards and references

  • EN 12464-1:2021 (lighting of indoor work places)
  • CIBSE SLL Code for Lighting

Assumptions

  • Lumen method: even layout in a rectangular room.
  • UF and MF entered by you; they depend on the luminaire and cleaning regime.

Inputs and units

Room lengthm
Room widthm
Target illuminancelux50–1500
Luminaire outputlm
Utilisation factor0.3–0.9
Maintenance factor0.6–0.95
Luminaire wattageW

Typical range: last column

Worked example (default values)

  • Room length12 m
  • Room width8 m
  • Target illuminance500 lux
  • Luminaire output4000 lm
  • Utilisation factor0.6
  • Maintenance factor0.8
  • Luminaire wattage36 W
Luminaires required25