Electrical

IP Ratings Explained

The IP (Ingress Protection) code from IEC 60529 rates an enclosure against solids and water. It is written IP followed by two digits.

How to read it

  • First digit (0–6): protection against solid objects and dust. 5 = dust protected, 6 = dust tight.
  • Second digit (0–9): protection against water. 4 = splashing, 5 = water jets, 6 = powerful jets, 7 = temporary immersion to 1 m, 8 = continuous immersion beyond 1 m (conditions set by the manufacturer).
  • An X means the property was not tested, e.g. IPX4.

Common ratings on site

RatingTypical use
IP20Indoor panels in electrical rooms
IP44Indoor wet areas, bathroom fittings
IP54Plant rooms, covered outdoor areas
IP65Outdoor luminaires and enclosures exposed to rain and dust
IP66Wash-down areas, coastal and marine locations
IP68Submersible pumps, in-ground uplighters, fountain lights
Good to knowA higher second digit does not include all lower ones: IP67 (immersion) does not automatically mean the enclosure passed the IP65 jet test. Products tested for both are marked IP65/IP67.

Use with this guide

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.