Cable Tray Fill

Percentage fill of a cable tray

Design data
mm
mm
mm
Settings & basis
ResultPreliminary · verify before design
Tray fill27.4 %10 cables of Ø28 mm
Within limitWithin the selected 40 % limit
Cable cross-section total6,158 mm²
Tray usable area22,500 mm²
Max cables at this limit14

Check the project specification: many require spare capacity (e.g. 20–25 %) and single-layer laying for power cables.

What to verify before design ↓

Verify before using in design

  • Many specifications require single-layer power cables and 20–25 % spare.
  • Apply grouping derating to the cable sizes.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.1 · Nov 2026Basis last checked: Nov 2026✓ Tested against worked examples✓ Reviewed by an electrical engineer · Nov 2026

Formula

Fill = Σ(π d² ÷ 4) ÷ (W × H)

Standards and references

  • Project specification and tray manufacturer (fill by area)
  • NFPA 70 (NEC) 392.22: separate rules by tray type and cable size, not checked here

Assumptions

  • Round cables; fill by cross-sectional area against the limit you choose. This is a space check only, not a code compliance check.

Inputs and units

Tray widthmm
Usable depthmm
Cable outer diametermm
Number of cables
Fill limit—

Typical range: last column

Worked example (default values)

  • Tray width300 mm
  • Usable depth75 mm
  • Cable outer diameter28 mm
  • Number of cables10
  • Fill limit40 %
Tray fill27.4 %Within the selected 40 % limit