Cooling Load (TR)

Quick AC tonnage from floor area

Design data
m²
%
Settings & basis
ResultPreliminary · verify before design
Cooling capacity7.5 TR26.4 kW of cooling
BTU/h90,080
Area per TR16.0 m²
Supply air (≈ 400 CFM/TR)1,417 L/s

Rule of thumb for hot climates. Final sizing needs a heat load study (e.g. HAP).

What to verify before design ↓

Verify before using in design

  • Do a full heat load calculation (HAP, TRACE or IES) before selecting equipment.
  • Glazing, orientation and occupancy can change the result a lot.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026

Formula

Q = A × load density × (1 + SF) TR = kW ÷ 3.517

Standards and references

  • Rule-of-thumb load densities for hot climates
  • ASHRAE Handbook — Fundamentals (load calculation methods)

Assumptions

  • Load per m² by space type, including typical fresh air.

Inputs and units

Floor aream²5–50000
Space type—
Safety factor%0–20

Typical range: last column

Worked example (default values)

  • Floor area120 m²
  • Space typeOffice · 200 W/m²
  • Safety factor10 %
Cooling capacity7.5 TR

Next steps

More Mechanical & HVAC calculators

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.