Mechanical & HVAC

Tonnage, COP and EER

Cooling capacity and efficiency appear in different units on every datasheet. These are the conversions that matter.

Conversions

  • 1 TR (ton of refrigeration) = 12,000 BTU/h = 3.517 kW of cooling.
  • COP = cooling output (kW) ÷ electrical input (kW). Dimensionless.
  • EER = cooling (BTU/h) ÷ electrical input (W). EER = COP × 3.412.
  • kW/TR = electrical input per ton, common for chillers. kW/TR = 3.517 ÷ COP.

Electrical impact

  • A chiller with 0.65 kW/TR on a 500 TR plant draws about 325 kW at full load.
  • Use the chiller's starting method and inrush data when sizing generators and transformers.
Good to knowAsk whether the efficiency figure is at full load or IPLV/ESEER (part-load). Part-load numbers look better and suit annual energy estimates, not electrical sizing.

Use with this guide

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.