Duct Sizing

Round and rectangular duct from airflow

Design data
L/s
m/s
Settings & basis
ResultPreliminary · verify before design
Round duct diameter412 mmNext standard: 450 mm
Within limitVelocity suits low-velocity commercial ducts
Required area0.133 m²
Rectangular (equal area)450 × 300 mm
Airflow1,695 CFM

Equal-area sizing. Check pressure drop with the equal-friction method for long runs.

What to verify before design ↓

Verify before using in design

  • Check pressure drop with the equal-friction method and noise criteria.
  • Keep aspect ratio at or below about 4:1 where possible.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026

Formula

A = Q ÷ v D = √(4A ÷ π)

Standards and references

  • ASHRAE Handbook — Fundamentals, duct design
  • SMACNA HVAC Duct Construction Standards

Assumptions

  • Equal-area sizing at the chosen velocity.

Inputs and units

AirflowL/s10–20000
Design velocitym/s2–12
Aspect ratio (W:H)—

Typical range: last column

Worked example (default values)

  • Airflow800 L/s
  • Design velocity6 m/s
  • Aspect ratio (W:H)2 : 1
Round duct diameter412 mmVelocity suits low-velocity commercial ducts