Cable Pulling Tension & Sidewall Pressure

Pulling tension through a duct run with one bend, both directions

Design data
kg/m
m
°
m
m
mm²
kN/m
Settings & basis
ResultPreliminary · verify before design
Pulling tension at the end (better direction)5.37 kNFeed the cable in at the end of straight 2 and pull from the start of straight 1
Within limitWithin the conductor limit 50.40 kN and the sidewall pressure limit
Direction A (feed at straight 1): after the straight / after the bend / at the winch2.33 kN / 4.05 kN / 5.80 kN
Direction B (feed at straight 2): after the straight / after the bend / at the winch1.75 kN / 3.03 kN / 5.37 kN
Sidewall pressure at the bend (A / B)3.37 / 2.53 kN/m
Bend multiplier e^(μθ)1.733
Maximum tension on the conductors50.40 kN
Highest sidewall pressure of the two directions3.37 kN/m

Simplified method for a horizontal duct run with one bend; cable weight inside the bend is ignored. Vertical bends, several bends, jam ratio, duct fill, pulling with a grip (stocking) and the maker's own limits need the cable maker's pulling calculation. Feeding from the end nearer the bend usually gives the lower tension; the calculator checks both directions.

What to verify before design ↓

Verify before using in design

  • Maximum tension and sidewall pressure from the cable maker for the actual cable and grip.
  • Duct fill and jam ratio when pulling three single cores together.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.1 · Nov 2026Basis last checked: Nov 2026✓ Tested against worked examples✓ Reviewed by a senior engineer · Nov 2026

Formula

Straight: T = T₀ + w·g·μ·L Horizontal bend: T = T₀·e^(μθ) Sidewall pressure = T ÷ R

Standards and references

  • IEEE 1185 (installation of cable in conduit and duct systems)
  • Cable maker's pulling and sidewall pressure limits
  • Project specification

Assumptions

  • Horizontal run: straight, one horizontal bend, straight; friction coefficient constant; cable weight in the bend ignored.
  • Pulling eye on the conductors: about 70 N/mm² copper, 53 N/mm² aluminium.

Inputs and units

Cable weightkg/m0.5–40
Friction coefficient (with lubricant)0.15–0.5
Straight length before the bendm1–500
Bend angle°5–90
Bend radiusm0.3–3
Straight length after the bendm0–500
Total conductor cross-section pulledmm²10–3000
Maximum sidewall pressure (cable maker)kN/m3–15
Conductor (pulling eye on the conductors)—

Typical range: last column

Worked example (default values)

  • Cable weight8.5 kg/m
  • Friction coefficient (with lubricant)0.35
  • Straight length before the bend80 m
  • Bend angle90 °
  • Bend radius1.2 m
  • Straight length after the bend60 m
  • Total conductor cross-section pulled720 mm²
  • Maximum sidewall pressure (cable maker)7.3 kN/m
  • Conductor (pulling eye on the conductors)Copper (about 70 N/mm²)
Pulling tension at the end (better direction)5.37 kNWithin the conductor limit 50.40 kN and the sidewall pressure limit

Next steps

More Utilities & infrastructure calculators

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.