Storm Water Flow (Rational Method)

Peak runoff Q = C·i·A for a small catchment with two surface types

Design data
ha
ha
mm/h
ResultPreliminary · verify before design
Peak storm water flow267.4 L/s0.267 m³/s from 2.50 ha
Within limitSmall catchment: rational method suitable for a first sizing
Total area2.50 ha
Weighted runoff coefficient0.77
Effective impervious area C·A1.925 ha
Runoff volume in 1 hour at this intensity963 m³

Take the rainfall intensity from the drainage authority's intensity-duration-frequency (IDF) curve for the design return period and the time of concentration. Size the pipe with the Drainage Pipe Capacity calculator; soakaways, storage and outfall limits follow the authority's rules.

What to verify before design ↓

Verify before using in design

  • Design return period, IDF curve and time of concentration from the drainage authority.
  • Catchment limit for the rational method in the authority's manual.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Nov 2026✓ Tested against worked examples✓ Reviewed by a senior engineer · Nov 2026

Formula

Q (m³/s) = C · i (mm/h) · A (ha) ÷ 360

Standards and references

  • Rational method (Q = C·i·A)
  • Drainage authority design manual and IDF curves
  • Project drainage specification

Assumptions

  • Uniform rainfall over the whole catchment for a duration equal to the time of concentration; runoff coefficients constant.

Inputs and units

Area 1 (paved, roofs)ha0.01–20
Runoff coefficient C, area 10.1–0.95
Area 2 (landscape, gravel; 0 if none)ha0–20
Runoff coefficient C, area 20.05–0.6
Rainfall intensity (for the design storm and time of concentration)mm/h10–200

Typical range: last column

Worked example (default values)

  • Area 1 (paved, roofs)2 ha
  • Runoff coefficient C, area 10.9
  • Area 2 (landscape, gravel; 0 if none)0.5 ha
  • Runoff coefficient C, area 20.25
  • Rainfall intensity (for the design storm and time of concentration)50 mm/h
Peak storm water flow267.4 L/sSmall catchment: rational method suitable for a first sizing

Next steps

More Water & wastewater calculators

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.