Disinfection Chlorine Dose

Hypochlorite needed to disinfect a tank or main

Design data
m³
mm
m
mg/L
%
kg/L
Settings & basis
ResultPreliminary · verify before design
Hypochlorite solution needed9.4 L1.41 kg of available chlorine for 56.5 m³
Water volume56.5 m³
Chlorine mass1.41 kg
Solution mass11.3 kg
Equivalent calcium hypochlorite (≈ 65 %)2.2 kg

Dose, contact time and the residual to reach come from the method you follow (e.g. AWWA C651 for mains, C652 for storage tanks, or EN 805) and the water authority. Hypochlorite loses strength in heat: check the product's actual strength. Dechlorinate before discharge.

What to verify before design ↓

Verify before using in design

  • Follow the specified method for dose, contact time and final residual, then flush and take bacteriological samples.
  • Neutralise chlorinated water before discharge to drains or the environment.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026✓ Tested against worked examples

Formula

Chlorine (kg) = V (m³) × dose (mg/L) ÷ 1,000 Solution (L) = kg ÷ (strength × density)

Standards and references

  • AWWA C651 (disinfecting water mains)
  • AWWA C652 (disinfection of water-storage facilities)
  • EN 805 (water supply systems outside buildings)

Assumptions

  • Dose in mg/L of available chlorine; hypochlorite strength as % available chlorine by weight.

Inputs and units

Volume from—
Volume (if known)m³
Pipe internal diametermm
Pipe lengthm
Target chlorine dosemg/L1–200
Hypochlorite strength (available chlorine)%3–15
Solution densitykg/L1–1.3

Typical range: last column

Worked example (default values)

  • Volume fromPipe length and diameter
  • Volume (if known)500 m³
  • Pipe internal diameter300 mm
  • Pipe length800 m
  • Target chlorine dose25 mg/L
  • Hypochlorite strength (available chlorine)12.5 %
  • Solution density1.2 kg/L
Hypochlorite solution needed9.4 L