Rebar Weight

Steel weight from bar size and length

Design data
m
Settings & basis
ResultPreliminary · verify before design
Total steel weight948.1 kg0.948 tonnes
Unit weight1.580 kg/m
Total length600 m
Weight per bar18.96 kg
What to verify before design ↓

Verify before using in design

  • Add laps, bends and wastage from the bar bending schedule.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026

Formula

kg/m = d² ÷ 162

Standards and references

  • BS 4449:2005+A3:2016 (unit masses)
  • BS 8666:2020 (bar scheduling)

Assumptions

  • Steel density 7850 kg/m³, giving d²/162 kg/m.

Inputs and units

Bar diametermm
Bar lengthm0.5–12
Number of bars

Typical range: last column

Worked example (default values)

  • Bar diameter16 mm
  • Bar length12 m
  • Number of bars50
Total steel weight948.1 kg

Next steps

More Civil & Structural calculators

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.