Concrete Quantity

Volume, cement bags and truck loads

Design data
m
m
m
%
m³
Settings & basis
ResultPreliminary · verify before design
Concrete to order12.60 m³12.00 m³ net + 5 % wastage
Cement4,788 kg
Cement bags (50 kg)96
Truck loads2

Cement content is indicative. Use the approved mix design.

What to verify before design ↓

Verify before using in design

  • Use the approved mix design and confirm the pour plan and truck schedule.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026

Formula

V = L × W × T × (1 + wastage)

Standards and references

  • BS EN 206:2013+A2:2021 (concrete specification)
  • ACI 211.1 (mix proportioning)

Assumptions

  • Rectangular element; cement content is indicative per grade.

Inputs and units

Lengthm
Widthm
Thicknessm0.05–3
Wastage%0–10
Concrete grade—
Truck capacitym³

Typical range: last column

Worked example (default values)

  • Length10 m
  • Width6 m
  • Thickness0.2 m
  • Wastage5 %
  • Concrete gradeC30
  • Truck capacity8 m³
Concrete to order12.60 m³