Crew Productivity

Duration from quantity and output rate

Design data
Settings & basis
ResultPreliminary · verify before design
Working days10 days1.7 weeks at 6 days/week
Daily output (all crews)240 units/day
Calendar days (approx.)12
Crews for half the duration4
What to verify before design ↓

Verify before using in design

  • Adjust for summer working-hour limits and Ramadan hours.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026

Formula

Duration = quantity ÷ (rate × crews)

Standards and references

  • Planning arithmetic

Assumptions

  • Steady output with no learning curve, weather or access losses.

Inputs and units

Total quantity
Output per crew per day
Number of crews
Working days per week—

Typical range: last column

Worked example (default values)

  • Total quantity2400
  • Output per crew per day120
  • Number of crews2
  • Working days per week6 days
Working days10 days

Next steps