Critical Path and Float

The critical path method finds the longest chain of dependent activities, which sets the shortest possible project duration.

Key terms

  • Critical path: activities with zero (or the least) total float. Any delay to them delays completion.
  • Total float: how long an activity can slip without delaying the project finish.
  • Free float: how long it can slip without delaying the next activity.
  • Near-critical: activities with small float that can turn critical quickly.

Watch for

  • Constraints and hard dates that hide the true critical path.
  • Missing logic (open ends) that makes float look larger than it is.
  • Long-lead electrical items such as transformers and switchgear, which often drive the path.
Good to knowCheck the float trend each update, not just the current float. Steady float erosion warns of delay before it appears on the finish date.