Critical Path and Float
The critical path method finds the longest chain of dependent activities, which sets the shortest possible project duration.
Key terms
- Critical path: activities with zero (or the least) total float. Any delay to them delays completion.
- Total float: how long an activity can slip without delaying the project finish.
- Free float: how long it can slip without delaying the next activity.
- Near-critical: activities with small float that can turn critical quickly.
Watch for
- Constraints and hard dates that hide the true critical path.
- Missing logic (open ends) that makes float look larger than it is.
- Long-lead electrical items such as transformers and switchgear, which often drive the path.