Site Establishment & Office Running Cost

Mobilisation, monthly office and welfare running costs, and demobilisation

Design data
months
L
ResultPreliminary · verify before design
Total site establishment and running cost2,449,1004.90 % of the contract value · 109,950 per month
ReviewBetween 3 and 5 % of the contract value: compare with the preliminaries in your tender
Mobilisation (one-off)350,000
Monthly running cost109,950
of which drinking water11,700
of which tea and pantry3,750
of which stationery2,500
Running cost for the duration1,979,100
Demobilisation (one-off)120,000
Running cost per staff per month4,398

Any currency. A first budget for the time-related preliminaries; staff salaries, plant, vehicles, insurances and bonds are separate cost codes. Drinking water for workers in summer heat is a safety requirement (see the Heat Stress guides), not a cost to cut.

What to verify before design ↓

Verify before using in design

  • Real quotations for cabins, connections and services.
  • Welfare facilities required by the labour law and the client's HSE rules.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Nov 2026✓ Tested against worked examples✓ Reviewed by a senior engineer · Nov 2026

Formula

Total = mobilisation + months × (rent + utilities + internet + security + water + pantry + stationery) + demobilisation

Standards and references

  • Tender preliminaries and the cost breakdown structure
  • Local labour and heat-stress rules for drinking water and welfare

Assumptions

  • Monthly costs constant over the duration; one-off mobilisation at the start and demobilisation at the end; water for staff and workers on working days.

Inputs and units

Contract value
Site durationmonths1–60
Office staff on site1–300
Workers on site (average)0–5000
Mobilisation (one-off: cabins delivery, fencing, connections, furniture, IT)
Demobilisation (one-off: removal, reinstatement, disconnections)
Cabins / office rent per month
Power and water bills per month
Internet and phones per month
Security and cleaning per month
Drinking water per person per dayL2–8
Drinking water price per litre0.05–5
Tea, coffee and pantry supplies per staff per month
Stationery and printing per staff per month
Working days per month20–31

Typical range: last column

Worked example (default values)

  • Contract value50000000
  • Site duration18 months
  • Office staff on site25
  • Workers on site (average)200
  • Mobilisation (one-off: cabins delivery, fencing, connections, furniture, IT)350000
  • Demobilisation (one-off: removal, reinstatement, disconnections)120000
  • Cabins / office rent per month45000
  • Power and water bills per month18000
  • Internet and phones per month6000
  • Security and cleaning per month23000
  • Drinking water per person per day4 L
  • Drinking water price per litre0.5
  • Tea, coffee and pantry supplies per staff per month150
  • Stationery and printing per staff per month100
  • Working days per month26
Total site establishment and running cost2,449,100Between 3 and 5 % of the contract value: compare with the preliminaries in your tender

Next steps

More Site practice calculators

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.