Ceiling Void Check

Do the services fit between the beam and the ceiling?

Design data
mm
mm
mm
mm
mm
mm
mm
mm
ResultPreliminary · verify before design
Spare space under the beam50 mm800 mm available, 750 mm needed
Within limitServices fit under the beam
Service layers stacked2
Space available (void − beam)800 mm
Space needed750 mm

A quick first check where services must cross under a beam in layers. Side-by-side services need width, not depth. Confirm in the coordinated 3D model with real sizes, insulation, hangers and access clearances.

What to verify before design ↓

Verify before using in design

  • Confirm in the federated 3D model with real sizes, hangers, insulation and maintenance access.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026✓ Tested against worked examples

Formula

Needed = duct + tray + pipe + sprinkler + ceiling zone + gaps between stacked layers Available = void − beam depth

Standards and references

  • Project coordination procedure and BIM execution plan
  • Manufacturers' data for duct, tray and pipe sizes

Assumptions

  • Services crossing under one beam are stacked in layers with a fixed gap between layers.

Inputs and units

Slab soffit to ceilingmm300–3000
Deepest beam the services crossmm
Duct incl. insulation (0 if none)mm
Cable tray (0 if none)mm
Largest pipe incl. insulation (0 if none)mm
Sprinkler pipe zone (0 if none)mm
Lights / ceiling zonemm
Gap between layers (hangers, access)mm0–150

Typical range: last column

Worked example (default values)

  • Slab soffit to ceiling1250 mm
  • Deepest beam the services cross450 mm
  • Duct incl. insulation (0 if none)400 mm
  • Cable tray (0 if none)0 mm
  • Largest pipe incl. insulation (0 if none)0 mm
  • Sprinkler pipe zone (0 if none)100 mm
  • Lights / ceiling zone150 mm
  • Gap between layers (hangers, access)50 mm
Spare space under the beam50 mmServices fit under the beam