Equipment Availability (MTBF / MTTR)

Availability, yearly downtime and the effect of standby units

Design data
h
h
%
Settings & basis
ResultPreliminary · verify before design
System availability99.60 %Single unit
Within limitMeets the required 99.5 %
Availability of one unit99.60 %
Expected downtime per year34.9 h
Failures per year (one unit)4.4
MTTR needed for the target (one unit)10.1 h

Standby units are treated as independent, with perfect switch-over and no common-cause failures, so the system figure is an upper limit. Use real failure records from your CMMS where you have them.

What to verify before design ↓

Verify before using in design

  • Use MTBF and MTTR from your own CMMS history or maker data, not a guess.
  • Add spare-part waiting time and response time to MTTR for the real (operational) availability.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Nov 2026✓ Tested against worked examples

Formula

A = MTBF ÷ (MTBF + MTTR) A(system) = 1 − (1 − A)^(standby + 1)

Standards and references

  • IEC 60050-192:2015 (dependability terms: availability, MTBF, MTTR)
  • IEEE Std 493-2007 (Gold Book): reliability of industrial and commercial power systems

Assumptions

  • Steady-state (inherent) availability: only repair time counts as downtime, not waiting for parts or planned shutdowns.
  • Standby units are independent, identical and switch over without failure.

Inputs and units

Mean time between failures (MTBF)h100–100000
Mean time to repair (MTTR)h0.5–200
Standby units—
Required availability%90–99.999

Typical range: last column

Worked example (default values)

  • Mean time between failures (MTBF)2000 h
  • Mean time to repair (MTTR)8 h
  • Standby unitsNone (single unit)
  • Required availability99.5 %
System availability99.60 %Meets the required 99.5 %