Coordinates: Bearing & Distance

New point from bearing and distance, or bearing and distance between two points

Design data
m
m
°
m
m
m
Settings & basis
ResultPreliminary · verify before design
Point BE 200,089.156 · N 400,087.61445° 30′ 00.00″ and 125.000 m from A
Within limitCheck the new point by measuring it from a second control point
ΔE89.156 m
ΔN87.614 m
Grid distance used125.000 m
Bearing in degrees, minutes, seconds45° 30′ 00.00″

Bearings are whole-circle, clockwise from grid north, entered in decimal degrees (e.g. 45° 30′ 00″ = 45.5). The combined scale factor (grid scale × height factor) comes from the survey control report; 1.0 ignores it, which is acceptable only over short distances.

What to verify before design ↓

Verify before using in design

  • Use coordinates and the scale factor from the approved control report.
  • Check every set-out point from an independent control point.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026✓ Tested against worked examples

Formula

E_B = E_A + d × k × sin(bearing) N_B = N_A + d × k × cos(bearing)

Standards and references

  • National grid definition (e.g. QND95 / Qatar National Grid, KSA-GRF17, Egypt 1907 belts)
  • Project survey control report (coordinates, scale factor)

Assumptions

  • Plane coordinates on one grid; whole-circle bearings from grid north.
  • Combined scale factor applied as entered.

Inputs and units

Calculate—
Point A eastingm
Point A northingm
Grid bearing A → B (for new point)°
Horizontal ground distance (for new point)m
Point B easting (for two points)m
Point B northing (for two points)m
Combined scale factor (grid ÷ ground)0.99–1.01

Typical range: last column

Worked example (default values)

  • CalculateNew point (from bearing and distance)
  • Point A easting200000 m
  • Point A northing400000 m
  • Grid bearing A → B (for new point)45.5 °
  • Horizontal ground distance (for new point)125 m
  • Point B easting (for two points)200150 m
  • Point B northing (for two points)400080 m
  • Combined scale factor (grid ÷ ground)1
Point BE 200,089.156 · N 400,087.614Check the new point by measuring it from a second control point

Next steps

More Surveying calculators

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.