Total Station Reduction

Slope distance and zenith angle to horizontal distance and level

Design data
m
°
m
m
m
Settings & basis
ResultPreliminary · verify before design
Level of the target point16.085 mHorizontal distance 152.293 m
Within limitHeight difference station to point 3.740 m
Horizontal distance152.293 m
Vertical component (SD × cos Z)3.988 m
Curvature and refraction1.6 mm
Vertical angle (90° − Z)1.5000°

Zenith angles are measured from the vertical (90° = horizontal), in decimal degrees. Curvature and refraction uses k = 0.13 and R = 6,371 km; it is about 1.6 mm at 150 m and grows with the square of the distance. Most total stations apply it automatically: check the instrument setting so it isn't applied twice.

What to verify before design ↓

Verify before using in design

  • Check the instrument's own curvature and refraction setting so it isn't applied twice.
  • Measure HI and HT carefully; they are the commonest source of level errors.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026✓ Tested against worked examples

Formula

HD = SD × sin Z V = SD × cos Z RL point = RL station + HI + V − HT + (1 − k) HD² ÷ 2R

Standards and references

  • Instrument manufacturer's manual
  • ISO 17123-3 / -4 (testing theodolites and EDM)

Assumptions

  • Zenith angle and slope distance already corrected for prism constant and atmosphere.
  • Spherical earth R = 6,371 km, refraction k = 0.13.

Inputs and units

Slope distancem1–5000
Zenith angle (90° = level)°45–135
Instrument heightm
Target (prism) heightm
Station levelm
Curvature and refraction—

Typical range: last column

Worked example (default values)

  • Slope distance152.345 m
  • Zenith angle (90° = level)88.5 °
  • Instrument height1.55 m
  • Target (prism) height1.8 m
  • Station level12.345 m
  • Curvature and refractionApply (k = 0.13)
Level of the target point16.085 mHeight difference station to point 3.740 m