Surveying

Total Stations & GNSS

Most site surveying uses a total station for precise local work and GNSS for fast positioning over open areas. Each has its strengths, and each gives wrong answers in its own way when used carelessly.

Total station

  • Measures horizontal and vertical (zenith) angles and slope distance; coordinates and levels are computed from them.
  • Set up over a control point (or by resection from several), orient on a backsight, and check on a second known point before work.
  • Enter the correct prism constant, temperature and pressure; measure instrument and target heights carefully.
  • Robotic instruments let one person work, but check on control during the day.

GNSS and RTK

  • RTK (real-time kinematic) gives centimetre positions using corrections from a base station or a CORS network.
  • National networks (for example KSA-CORS in Saudi Arabia) provide network RTK across the country.
  • Accuracy drops near buildings, under trees and close to reflective surfaces; heights are weaker than plan positions.
  • Use the correct transformation and geoid to get national grid coordinates and levels.

Calibration and records

  • Keep valid calibration certificates for instruments and check them in the field (collimation, compensator, optical plummet).
  • Store raw data, not just results, and name files by date and task.
  • Record who measured what, with which instrument, from which control.
Good to knowBefore starting, measure one known point you didn't set up on. If it doesn't check, nothing else measured that day will be right.

Use with this guide

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.