Levelling Closure Check

Misclosure of a level run against the allowable ± c √K

Design data
m
m
m
m
km
mm
ResultPreliminary · verify before design
Misclosure-6.0 mmAllowable ±13.1 mm (12 √1.20 km)
Within limitWithin the allowable misclosure: distribute it and accept the run
Computed closing level10.012 m
Rise − fall (ΣBS − ΣFS)0.012 m
Correction per km if distributed5.0 mm/km

Typical c values range from about 4 mm for precise work to 12 mm or more for ordinary site levelling; use the value in your survey specification. Close every run on a known benchmark, or back on the starting one. Distribute an accepted misclosure in proportion to distance or number of set-ups.

What to verify before design ↓

Verify before using in design

  • Check the benchmark values and their datum in the control report.
  • Do a two-peg test on the level before important work.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026✓ Tested against worked examples

Formula

Closing RL = start RL + ΣBS − ΣFS Misclosure = computed − known Allowable = ± c √K (mm, K in km)

Standards and references

  • Project survey specification (allowable misclosure)
  • RICS / national survey guidance on levelling
  • ISO 17123-2 (field procedures for testing levels)

Assumptions

  • Closed run (on a known benchmark or back to the start).
  • Allowable misclosure follows ± c √K with c from the specification.

Inputs and units

Starting benchmark levelm
Sum of backsights (ΣBS)m
Sum of foresights (ΣFS)m
Known level of the closing benchmarkm
Length of the level runkm0.01–50
Allowable misclosure constant c (project-defined)mm1–30

Typical range: last column

Worked example (default values)

  • Starting benchmark level10 m
  • Sum of backsights (ΣBS)15.432 m
  • Sum of foresights (ΣFS)15.42 m
  • Known level of the closing benchmark10.018 m
  • Length of the level run1.2 km
  • Allowable misclosure constant c (project-defined)12 mm
Misclosure-6.0 mmWithin the allowable misclosure: distribute it and accept the run

Next steps

More Surveying calculators

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.