Roads & pavements

Road Geometry & Drainage

Geometry decides whether a road is safe to drive at its design speed. Drainage decides how long the pavement lasts. Both are fixed in the design but checked on site in the levels.

Cross-section

  • Cross-fall or camber sheds water from the carriageway, typically about 2–2.5 % for asphalt (set by the design manual).
  • Superelevation tilts the road on curves to balance side friction; the manual limits the maximum value.
  • Shoulders, kerbs and channels carry water to gullies or open drains.

Vertical alignment

  • Grades are joined by parabolic vertical curves. Their length is set by the K value (length per 1 % change in grade).
  • Crest curves need enough length for stopping sight distance; sag curves for headlight reach, comfort and drainage.
  • Avoid long flat zones at sag low points, where water ponds; place gullies at the low point.

Storm water

  • Design storms are rare but intense in the Gulf, so follow the authority's design rainfall and return period.
  • Gullies, manholes, pipes and soakaways or outfalls are sized from catchment and rainfall.
  • Subsurface drains protect the pavement where groundwater is high.
  • Check levels of gully gratings and kerbs on site; a few millimetres decide whether water enters the gully.
Good to knowWalk the road after the first heavy rain with the drawings. Ponding shows exactly where the levels or the gullies are wrong.