Vertical Curve (Crest / Sag)

Level at any chainage, K value and high or low point

Design data
%
%
m
m
m
m
ResultPreliminary · verify before design
Level at chainage 1,050.00048.688 mCrest curve, 150.000 m from BVC
Curve typeCrest
Algebraic difference A5.00 %
K value (L ÷ A)40.0
BVC chainage / level900.000 / 47.000 m
EVC chainage / level1,100.000 / 48.000 m
Middle offset at PVI1.250 m
High point1,020.000 / 48.800 m

Symmetrical parabolic curve, grades in %. Check the K value against the minimum for your design speed in the governing design manual (sight distance, comfort and drainage at sag low points).

What to verify before design ↓

Verify before using in design

  • Check K against the minimum for the design speed (stopping sight distance for crests, headlight and comfort for sags).
  • Place gullies at sag low points and check flat zones for ponding.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026✓ Tested against worked examples

Formula

y = yBVC + g1·x + (g2 − g1) ÷ (200 L) · x² K = L ÷ |A| e = A·L ÷ 800

Standards and references

  • AASHTO A Policy on Geometric Design of Highways and Streets (Green Book)
  • Qatar Highway Design Manual (QHDM) or the governing national manual

Assumptions

  • Symmetrical parabolic vertical curve; grades in percent, positive uphill in the chainage direction.

Inputs and units

Incoming grade g1%
Outgoing grade g2%
Curve length Lm20–1000
PVI chainagem
PVI levelm
Chainage to checkm

Typical range: last column

Worked example (default values)

  • Incoming grade g13 %
  • Outgoing grade g2-2 %
  • Curve length L200 m
  • PVI chainage1000 m
  • PVI level50 m
  • Chainage to check1050 m
Level at chainage 1,050.00048.688 m

Next steps

More Roads & pavements calculators

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.