PLC, DCS & SCADA Basics
Every automated plant, pumping station or building has a control system that reads field signals, runs logic and drives outputs. The names overlap in practice, but knowing what each type is built for helps you read the specification and ask the right questions.
Three families
- PLC (programmable logic controller): rugged controller for machines, packages and fast discrete logic; programmed in the IEC 61131-3 languages (ladder, function block, structured text, sequential function chart).
- DCS (distributed control system): one integrated system for a large continuous process, with controllers, operator stations, historian and engineering tools sharing one database.
- SCADA: supervisory control and data acquisition over a wide area (water networks, pipelines, power grids), gathering data from PLCs and RTUs over telemetry links.
- Packages (chillers, generators, water treatment skids) usually come with their own PLC and talk to the main system over a network.
Architecture and redundancy
- Controllers, I/O modules (local or remote), networks, operator stations (HMI), engineering station and historian.
- Critical systems use redundant controllers, power supplies and networks, so one failure doesn't stop the process.
- An I/O list fixes every signal: tag, type (DI, DO, AI, AO), range, location and the cabinet it lands in. Plan 10–20 % spare I/O (project-defined).
- Safety functions run in a separate, certified safety system (SIS) designed to IEC 61511, not in the basic control system.
Operator screens and alarms
- HMI graphics follow a style guide (ISA-101): grey backgrounds, colour only for abnormal states.
- Alarm management to ISA-18.2 / IEC 62682: every alarm needs an operator action; floods of alarms hide the important one.
- Trends and the historian are how engineers find out what really happened.