4–20 mA Scaling

Signal to process value and back, with NAMUR NE 43 fault levels

Design data
mA
Settings & basis
ResultPreliminary · verify before design
Process value5.00050.0 % of the range 0.00 to 10.00
Within limitInside the normal signal range (3.8 to 20.5 mA)
Percent of range50.00 %
Signal12.00 mA
Value at 8 / 12 / 16 mA2.500 / 5.000 / 7.500

Linear transmitters only; a square-root (flow from differential pressure) or characterised output needs its own curve. NAMUR NE 43: 3.8–20.5 mA carries the measurement, 3.6 mA or less and 21 mA or more mean a fault. Check what the control system is configured to do with each level.

What to verify before design ↓

Verify before using in design

  • Confirm LRV and URV in the instrument index and in the transmitter itself.
  • Check the control system's scaling and alarm limits match during the loop check.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026✓ Tested against worked examples

Formula

PV = LRV + (mA − 4) ÷ 16 × (URV − LRV) mA = 4 + 16 × (PV − LRV) ÷ (URV − LRV)

Standards and references

  • IEC 60381-1 (analogue current signals)
  • NAMUR NE 43 (signal levels for failure information)
  • Transmitter datasheet (range, output characteristic)

Assumptions

  • Linear output between 4 and 20 mA.
  • NE 43 levels as configured in the transmitter and the control system.

Inputs and units

Convert—
Range at 4 mA (LRV)
Range at 20 mA (URV)
Signal (for mA → value)mA0–24
Process value (for value → mA)

Typical range: last column

Worked example (default values)

  • ConvertmA → process value
  • Range at 4 mA (LRV)0
  • Range at 20 mA (URV)10
  • Signal (for mA → value)12 mA
  • Process value (for value → mA)7.5
Process value5.000Inside the normal signal range (3.8 to 20.5 mA)

Next steps

More Controls & automation calculators

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.