Controls & automation

Industrial Networks & OT Cybersecurity

Control systems used to be isolated. Today they connect to office networks, the cloud and remote support, and attacks on industrial plants are real. Security has to be designed in, not added at handover.

Industrial networks

  • Common protocols: Modbus TCP, PROFINET, EtherNet/IP, OPC UA, BACnet/IP; IEC 61850 in substations.
  • Use managed switches, ring or redundant topologies for critical networks, and document every connection.
  • Keep time synchronised across the system; event records are useless without the right time.

Zones and conduits (IEC 62443)

  • Group equipment into zones with the same security needs, and control traffic between them through defined conduits (firewalls).
  • A demilitarised zone (DMZ) separates the control network from the office network; no direct connections between them.
  • Remote access only through a controlled, logged and time-limited route, never through a supplier's own modem.
  • National rules apply in some sectors (for example Saudi NCA's operational technology cybersecurity controls); check the client's requirements.

Good practice on projects

  • Change default passwords; one account per person; remove accounts when people leave the project.
  • Disable unused ports and services; control USB use on engineering stations.
  • Back up configurations and keep an asset inventory of every networked device with its firmware version.
Good to knowAsk on day one who owns the control network after handover. Security without an owner stops on the day the contractor leaves.

Use with this guide

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.