PFDs, P&IDs & Process Safety Studies
Every process plant is described by a small set of documents. If you can read a P&ID and know where the safety studies sit, you can find your way on any oil, gas, chemical or desalination project.
The key documents
- PFD (process flow diagram): main equipment, streams and the heat and material balance.
- P&ID (piping and instrumentation diagram): every line, valve, instrument and control loop. It is the master document for design, construction and commissioning.
- Line list: each line number with its size, piping class, design pressure and temperature, test pressure and insulation.
- Equipment list, instrument index and cause and effect charts (which trip closes which valve).
Reading a P&ID
- A line number usually carries size, service code, sequence number and piping class (e.g. 6"-HC-1001-A1A-IH).
- Spec breaks show where the piping class changes, often at a valve or flange.
- Instrument bubbles follow ISA 5.1: letters give the measured variable and function (PT, FCV, LSHH).
- Check the legend sheets first: symbols vary between clients. The Symbols page on this site covers the common ones.
Process safety studies
- HAZID early in design, HAZOP on the P&IDs: a team applies guide words (no, more, less, reverse) to each node.
- LOPA checks whether the protection layers are enough; gaps lead to safety instrumented functions.
- Safety instrumented systems are designed to IEC 61511, with a target SIL for each function.
- Every study action must be closed and recorded before start-up.