Relief Valve Sizing (Gas)

Required orifice area for gas or vapour, and the API 526 letter

Design data
kg/h
barg
°C
kg/kmol
Settings & basis
ResultPreliminary · verify before design
Required effective orifice area918 mm²Relieving pressure 1,751 kPa abs
Within limitFits a standard API 526 orifice (77 % of its area)
API 526 orifice letterK
Orifice effective area1,186 mm²
Coefficient C0.0261
Flow stays critical below back pressure8.6 barg

API 520 Part I, gas or vapour in critical flow, SI units (A mm², W kg/h, P1 kPa abs, T K). Kd = 0.975 is the effective value for preliminary sizing; the certified value for the selected valve replaces it. The relieving rate comes from the scenario analysis to API 521 (blocked outlet, fire, control-valve failure and others). Check the inlet pressure loss (usually below 3 % of set pressure) and the built-up back pressure.

What to verify before design ↓

Verify before using in design

  • Relieving rate from a documented scenario study (API 521); pick the governing case.
  • Final sizing with the maker's certified coefficient and actual area; check inlet loss and back pressure.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026✓ Tested against worked examples

Formula

A = W ÷ (C × Kd × P1 × Kb × Kc) × √(T × Z ÷ M) C = 0.03948 √(k (2 ÷ (k+1))^((k+1)÷(k−1))) Kd = 0.975

Standards and references

  • API 520 Part I (sizing and selection)
  • API 520 Part II (installation)
  • API 521 (pressure-relieving and depressuring systems)
  • API 526 (flanged steel relief valves: orifice letters)
  • ASME BPVC Section VIII Div. 1 (overpressure limits)

Assumptions

  • Gas or vapour in critical (choked) flow; back pressure below the critical value.
  • Kd = 0.975 effective coefficient for preliminary sizing.

Inputs and units

Required relieving ratekg/h
Set pressurebarg
Allowable overpressure—
Relieving temperature°C
Molecular weightkg/kmol2–200
Ratio of specific heats k = Cp/Cv1.01–1.8
Compressibility factor Z0.3–1.2
Back-pressure correction Kb0.3–1
Rupture disc upstream?—

Typical range: last column

Worked example (default values)

  • Required relieving rate10000 kg/h
  • Set pressure15 barg
  • Allowable overpressure10 % (single valve)
  • Relieving temperature80 °C
  • Molecular weight20 kg/kmol
  • Ratio of specific heats k = Cp/Cv1.27
  • Compressibility factor Z0.95
  • Back-pressure correction Kb1
  • Rupture disc upstream?No (Kc = 1.0)
Required effective orifice area918 mm²Fits a standard API 526 orifice (77 % of its area)

Next steps

More Process & industrial calculators

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.