Pavement Types & Layers
A pavement spreads wheel loads so the subgrade below is not overstressed. Each layer is stronger and more expensive than the one beneath it, so the design puts the best material where the stress is highest.
Flexible and rigid
- Flexible (asphalt) pavements spread load through layers of bound and unbound material. They are quicker to build and repair, and common on Gulf highways and streets.
- Rigid (concrete) pavements carry load by slab bending. They suit ports, bus lanes, industrial yards and heavy, slow or standing loads.
- Composite and block (interlocking paver) pavements are used for car parks, footways and some industrial areas.
The layers (flexible pavement)
- Subgrade: the natural or filled ground, prepared and compacted. Its strength (CBR or resilient modulus) drives the whole design.
- Sub-base: granular layer that protects the subgrade and drains water.
- Base: crushed aggregate or asphalt base that carries most of the load spreading.
- Binder course and wearing course: asphalt layers that resist rutting, cracking and give skid resistance.
- Thin sprayed layers between them: prime coat on granular base and tack coat between asphalt layers.
Design inputs
- Traffic: number and weight of heavy vehicles over the design life, usually as equivalent standard axles (ESALs).
- Subgrade strength: CBR or resilient modulus from tests.
- Climate: high pavement temperatures in the Gulf make rutting the main risk, so specifications often require polymer-modified or high-grade binders.
- Methods: AASHTO 1993 empirical design, mechanistic-empirical methods, or the national design manual named in the contract.
Layer roles (typical)
| Layer | Typical material | Main job |
|---|---|---|
| Wearing course | Dense asphalt, SMA | Skid resistance, waterproofing, ride |
| Binder course | Asphalt concrete | Spread load, resist rutting |
| Base | Crushed aggregate or asphalt base | Main load spreading |
| Sub-base | Granular material | Protect subgrade, drainage |
| Subgrade | Natural soil or fill | Final support |