Earthworks, Subgrade & Compaction
Compaction pushes soil particles together so the layer is stronger, stiffer and less permeable. Every layer is compared with a laboratory test of the same material.
Laboratory tests
- Proctor test gives the maximum dry density (MDD) and optimum moisture content (OMC). The modified test uses more energy than the standard test, and is usual for roads.
- CBR (California Bearing Ratio) measures strength for pavement design and material acceptance, often after soaking.
- Grading, plasticity (Atterberg limits) and, in the Gulf, salt and gypsum content to accept or reject the fill source.
Placing and compacting
- Place in layers of the specified thickness; common practice is about 150–250 mm compacted, but the spec and the roller decide.
- Bring the material near OMC before rolling. Too dry will not compact; too wet will pump and rut.
- Roll with the approved number of passes from a trial, then test before the next layer.
- Proof-roll the subgrade with a loaded truck to find soft spots; remove and replace them.
Field testing and Gulf issues
- Sand cone and nuclear gauge tests give field density and moisture. Calibrate the gauge for the local material.
- Compare dry density with MDD to get the relative compaction and check moisture against OMC.
- Sabkha, collapsible and gypsum-rich soils need special treatment: removal, geotextile separation or stabilisation.
- Water for compaction may be restricted if saline; follow the specification.