Fire protection

Passive Fire Protection & Smoke Control

Passive fire protection is built into the structure: walls, floors, doors and seals that keep fire and smoke inside one compartment long enough for people to escape and firefighters to act. It only works if every opening through it is sealed.

Compartments and ratings

  • The fire strategy divides the building into compartments with fire-resistance ratings (e.g. 60, 90 or 120 minutes) for walls, floors, shafts and doors.
  • Escape stairs and corridors are protected routes; their doors must close and latch on their own.
  • Structural steel may need fire protection (boards, sprayed coatings or intumescent paint) to the required rating.

Penetrations

  • Every pipe, duct and cable through a rated wall or floor needs a tested fire-stopping system matched to the service and the wall type.
  • Fire dampers (and combination fire and smoke dampers) close ducts at compartment walls; they need access panels for testing.
  • Label fire-stopping with the system, rating and installer, and inspect before ceilings close.

Smoke control

  • Stair pressurisation, smoke extract and car park ventilation keep escape routes clear; they start from the fire alarm per the cause and effect matrix.
  • Fans, dampers and power supplies for smoke control need fire-rated cables and secondary supplies.
  • Test them with the civil defence: airflow, door opening forces and pressure differences.
Good to knowPhotograph every fire-stopping seal before it is covered. It is the only proof you'll have when the ceiling is closed.