Façade Fire Safety
Façade fires can spread up a tall building faster than any fire service can respond. Grenfell Tower in London (2017) and several high-rise fires in the Gulf changed the rules: the materials, the cavities and the whole system now have to be shown to resist fire spread.
Materials
- Aluminium composite panels (ACP / ACM) with a polyethylene core were behind several of the worst façade fires; most jurisdictions now restrict combustible cores on tall buildings.
- Insulation, membranes and other components in the cavity count too, not just the visible panel.
- Classifications such as EN 13501-1 (A1 and A2-s1,d0 for non-combustible or limited combustibility) are common in specifications.
Systems and cavities
- Some codes accept system tests of the whole wall build-up, for example NFPA 285 or BS 8414 (assessed to BR 135).
- Cavity barriers and fire stopping at every floor slab and around openings stop fire racing up the ventilated cavity.
- The slab-edge gap between the curtain wall and the floor needs a tested fire-stopping system, not just mineral wool.
In the Gulf
- Civil defence authorities in Qatar, Saudi Arabia and the UAE require approval of façade materials and test evidence under their fire codes (for example the UAE Fire and Life Safety Code and the Saudi Building Code fire requirements, SBC 801).
- Check the latest local rules on every project: requirements were tightened after several high-rise façade fires and continue to change.
- Keep certificates, test reports and approved data sheets for every material in the façade dossier.