Grenfell Tower, 2017
A fire in a London residential tower spread rapidly up the outside of the building, killing 72 people.
What happened
- The refurbishment cladding used aluminium composite panels with a polyethylene core, which burns readily.
- Fire spread up and around the façade far faster than the 'stay put' strategy assumed.
The lesson
- Check the fire performance of every façade component and the system as tested.
- Material substitutions during construction need fire engineering review.