Façade

Glass & Glazing Performance

In the Gulf, glass decides much of a building's cooling load and comfort. Choosing it means balancing daylight and views against solar heat, glare and cost, then making sure the glass on site is the glass that was approved.

Performance values

  • SHGC (solar heat gain coefficient, or g-value): the share of solar heat that gets through; lower is better in hot climates.
  • U-value: heat conducted through the unit per degree of temperature difference; double glazing with a low-E coating and gas fill lowers it.
  • Visible light transmission (VLT): how much daylight gets in; selective coatings keep VLT up while cutting SHGC.
  • Values for the whole unit come from the maker; coating position (surface 2 or 3) changes them.

Types of glass

  • Annealed (float) glass breaks into large sharp pieces.
  • Heat-strengthened glass is about twice as strong and breaks into larger pieces that tend to stay in the frame.
  • Toughened (fully tempered) glass is about four to five times stronger and breaks into small fragments; it can break spontaneously from nickel sulphide inclusions unless heat-soak tested.
  • Laminated glass keeps fragments bonded to the interlayer: used overhead, for balustrades and where fall-out must be prevented.

On site

  • Check labels, stamps and certificates against the approved glass make-up for every delivery.
  • Protect glass from weld spatter, cement and alkaline run-off; clean only with approved methods.
  • Record breakages and replacements; thermal stress cracks often start at damaged edges.
Good to knowAsk for a full-size glass sample in daylight before approval. The same coating looks very different on a sample board and on a forty-storey façade.

Use with this guide

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.