Bearing Capacity & Settlement
A foundation must not fail in shear (bearing capacity) and must not settle too much (settlement). The allowable bearing pressure is the lower of the two limits.
Bearing capacity
- Ultimate bearing capacity is the pressure that causes shear failure of the soil.
- Allowable = ultimate ÷ factor of safety, typically 2.5–3 in working stress design. Eurocode 7 uses partial factors instead.
- It depends on soil strength (c′, φ′), footing width and depth, and groundwater. A water table at the base can cut the width term by about half.
Settlement
- Immediate settlement happens as load is applied; dominant in sands.
- Consolidation settlement develops over months or years in clays as water drains out.
- Differential settlement between footings causes cracks; it matters more than the total value.
- Typical limits: about 25 mm total for isolated footings on sand and about 50 mm for rafts, but the structure and finishes decide the real limit.
Choosing the foundation
- Shallow pads and strips when good soil is near the surface.
- Rafts to spread load and reduce differential settlement.
- Piles when good soil is deep or loads are high; check negative skin friction in soft or fill layers.