PA Amplifier Sizing

100 V line amplifier power per zone

Design data
%
Settings & basis
ResultPreliminary · verify before design
Amplifier, next standard size240 WRequired 150 W = load 120 W + 25 % headroom
Required amplifier power150 W
Line current at speaker load1.20 A
Line current at amplifier full power2.40 A
Load impedance83.3 Ω
Consider splitting into zones above≈ 500 W per amplifier channel

Voice alarm systems follow EN 54-16 / BS 5839-8: add a standby amplifier and check speech intelligibility (STI) in each area.

What to verify before design ↓

Verify before using in design

  • Check 100 V line voltage drop on long runs and STI in each area.
  • Voice alarm needs a standby amplifier and A/B circuits.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.1 · Nov 2026Basis last checked: Nov 2026✓ Tested against worked examples✓ Reviewed by an electrical engineer · Nov 2026

Formula

Amplifier W = speakers × tap power × (1 + headroom)

Standards and references

  • EN 54-16 / EN 54-24
  • BS 5839-8:2023

Assumptions

  • All speakers at the selected tap on a constant-voltage line.

Inputs and units

Number of speakers
Tap setting per speakerW
Headroom%
Line voltageV

Typical range: last column

Worked example (default values)

  • Number of speakers40
  • Tap setting per speaker3 W
  • Headroom25 %
  • Line voltage100 V line
Amplifier, next standard size240 W

Next steps

More ELV calculators

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.