Public Address & Voice Alarm
A public address (PA) system plays paging and background music. A voice alarm (VA) system is a life safety system that broadcasts evacuation messages on a fire alarm signal. Most buildings combine both in one PA/VA system.
How it works
- Speakers are connected in parallel on a 100 V line (70 V in some markets). Each speaker has a transformer with power taps, e.g. 1.5, 3 or 6 W.
- The building is divided into zones so messages can be sent to one area or all areas.
- Priority order: fire alarm evacuation, then emergency microphone, then general paging, then background music.
Voice alarm requirements
- Control equipment to EN 54-16 and loudspeakers to EN 54-24; design to BS 5839-8 or NFPA 72 chapter 24.
- Use A/B wiring (two circuits per area interleaved) so one cable fault does not silence a whole area.
- Fire-resistant cable, a standby amplifier and battery standby are required.
- Pre-recorded messages in the languages of the building users, usually Arabic and English in the region.
Sound quality
- Speech intelligibility is measured as STI. A common target for voice alarm is an STI of at least 0.50.
- The sound level must be clearly above background noise; in very reverberant areas add more speakers at lower power rather than fewer loud ones.
- Acoustic modelling software (e.g. EASE) helps in atria, halls and car parks.
Typical speaker tap settings
| Area | Typical tap |
|---|---|
| Offices, corridors | 1.5 – 3 W ceiling speaker |
| Car parks, plant rooms | 6 – 10 W horn or projector |
| Atria and halls | Column or line array |
| Outdoor areas | Weatherproof horn, 10 – 30 W |