Clean Agent Quantity

Total flooding agent mass for a room (NFPA 2001 method)

Design data
m³
°C
%
Settings & basis
ResultPreliminary · verify before design
Agent quantity82.0 kg0.547 kg per m³ at 7.0 %
Within limitConcentration is below the agent's no-adverse-effect level for occupied rooms
Specific vapour volume S0.1377 m³/kg
Flooding factor0.547 kg/m³
No-adverse-effect level (NOAEL)9.0 %

NFPA 2001 total flooding with constants for the selected agent. Use the design concentration from the system's listed design manual (for HFC-227ea commonly about 6.6–7 % for Class A, higher for Class B); add the maker's allowances for altitude and room openings. The room must pass a door fan integrity test to hold the concentration.

What to verify before design ↓

Verify before using in design

  • Use the design concentration from the listing for the actual hazard (Class A, B or C).
  • Room integrity (door fan) test before handover; check hold time.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026✓ Tested against worked examples

Formula

W = (V ÷ S) × C ÷ (100 − C) S = k1 + k2 × T

Standards and references

  • NFPA 2001 (clean agent fire extinguishing systems)
  • ISO 14520
  • System maker's listed design manual

Assumptions

  • Total flooding of a closed room at the minimum expected temperature.
  • No altitude correction or leakage allowance.

Inputs and units

Agent—
Protected volume (net)m³5–5000
Minimum room temperature°C0–40
Design concentration (from the system listing)%4–12

Typical range: last column

Worked example (default values)

  • AgentHFC-227ea (e.g. FM-200)
  • Protected volume (net)150 m³
  • Minimum room temperature21 °C
  • Design concentration (from the system listing)7 %
Agent quantity82.0 kgConcentration is below the agent's no-adverse-effect level for occupied rooms

Next steps

More Fire protection calculators

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.