Water & wastewater

Wastewater Collection & Gravity Sewers

Gravity sewers carry wastewater downhill to a pumping station or treatment plant. The design must carry the peak flow without surcharging, keep solids moving at low flow, and resist the corrosive gases sewage produces in hot climates.

Flows and hydraulics

  • Average flow is a share of water use (often about 80 %), plus an infiltration allowance.
  • A peak factor (e.g. Harmon's formula) converts average to peak flow; it falls as the population grows.
  • Pipes are sized with Manning's equation and usually designed to run part-full at peak, with a maximum depth ratio set by the authority.
  • A self-cleansing velocity (commonly about 0.6–0.75 m/s) keeps solids from settling; very high velocities cause scour.

Construction

  • Pipes laid to line and level from the long section, on the specified bedding and surround.
  • Manholes at changes of direction, gradient and size, and at maximum spacing; benching shaped to the flow.
  • Connections made into manholes or with proper junctions, never by breaking into the pipe.
  • Backfill compacted in layers so the pipe isn't crushed or deflected.

Hot-climate problems

  • Hydrogen sulphide (H2S) forms in warm, slow sewage and rising mains; it corrodes concrete and is deadly to workers.
  • Use corrosion-resistant pipes and manhole linings (GRP, PVC, HDPE, lined concrete) where H2S is expected.
  • Ventilate, avoid long flat runs and long retention in wet wells, and treat odour at pumping stations.
  • Confined-space entry into manholes needs a permit, gas testing and rescue arrangements.
Good to knowCheck every manhole invert level as it's built against the long section. One manhole built 50 mm high can leave a flat pipe that silts up for its whole life.