Utility Detection & Surveys
Gulf cities are full of buried power cables, fibre, water and gas lines, and records are often incomplete. Striking a live cable or a main is one of the most dangerous and expensive mistakes on site.
Before excavation
- Collect utility records from every owner and the authority's NOC (no-objection) process.
- Scan the area with a cable avoidance tool (CAT and signal generator) and, where needed, ground-penetrating radar (GPR).
- Mark detected services on the ground with the agreed colour code and record them on a drawing.
- Utility surveys are often classified by quality levels (for example PAS 128 in the UK): records only, detection, verified by trial holes.
Trial holes and safe digging
- Confirm critical services with hand-dug or vacuum-excavated trial pits before machine digging.
- Keep machines away from marked services by the distance in the permit; dig by hand near them.
- Treat every cable as live until proven otherwise; stop and report any unknown service.
Recording
- Survey exposed services (position, depth, size, type) before backfilling and add them to the as-built drawings.
- Share the records with the client and the utility owners; they protect the next contractor.