Excavation Safety
Excavation collapses kill workers every year, often in trenches less than 2 m deep. Support, safe access and daily inspection save lives.
Before digging
- Get a permit and confirm buried services with drawings, scanning and trial holes.
- Use the temporary works design for slopes or support; never rely on 'the soil looks stable'.
- Plan spoil and plant positions away from the edge.
Key rules (OSHA as an example; local rules may be stricter)
- Protective systems (sloping, benching, shoring or trench boxes) for excavations 1.5 m (5 ft) deep or more, unless in stable rock.
- Keep spoil and materials at least 0.6 m (2 ft) back from the edge.
- Provide a ladder or ramp within 7.6 m (25 ft) of workers in trenches 1.2 m (4 ft) deep or more.
- Daily inspection by a competent person, and after rain or any change.
Other hazards
- Falls: edge protection and barriers around the excavation.
- Atmosphere: test for oxygen and gases in deep or confined excavations.
- Water ingress and undermining of nearby foundations or roads.
- Plant: banksmen and stop blocks for vehicles near edges.