Confined Spaces
A confined space is enclosed, has limited entry and exit, and may contain a dangerous atmosphere. Most deaths happen to would-be rescuers.
Entry rules
- Entry only under a confined space permit.
- Test the atmosphere before entry and keep monitoring: oxygen (typically 19.5–23.5 %), flammable gases and toxic gases such as H₂S and CO.
- Ventilate the space and isolate pipes, valves and power that feed it.
- A trained standby person stays at the entrance at all times and never enters to rescue alone.
Rescue
- Have the rescue equipment (tripod, winch, harness, breathing apparatus) ready before entry.
- Agree communication signals with the entrant.
- Call the emergency team first. Untrained rescue attempts often add victims.