Site safety

Toolbox Talks, Incidents & Safety KPIs

Safety is managed with a few simple routines done every day: short talks before work, honest reporting of what went wrong or nearly went wrong, and numbers that show whether the site is getting safer.

Toolbox talks

  • A short talk (10–20 minutes) at the start of the shift on one topic linked to the day's work: heat, lifting, a recent near miss.
  • Speak in the crew's languages, keep it practical and record the topic, presenter and signed attendance.
  • Track talks and attendee-hours monthly; topics should follow the risks of the work coming up.

Incidents and near misses

  • Report every incident and near miss the same day; near misses are free lessons.
  • Investigate to find root causes (5 whys, fishbone), not to blame; close the actions and share the lessons.
  • Everyone has stop work authority: anyone can stop a task they believe is unsafe, without penalty.

Safety KPIs

  • Lagging indicators count harm: LTIFR (lost time injury frequency rate) and TRIR (total recordable injury rate), per 1,000,000 or 200,000 hours worked.
  • Leading indicators show effort: inspections done, toolbox talks, near-miss reports, action close-out rate, training.
  • Compare rates only on the same base and case definitions, and include subcontractors' hours.
Good to knowA rising near-miss count is usually good news: it means people trust the system enough to report. Worry when it suddenly drops to zero.