Paper Sizes and Drawing Scales
Every drawing is a balance between the size of what you draw, the scale and the sheet. Standard sizes and scales keep a drawing set readable and consistent.
ISO A-series sheets (ISO 216)
- A0: 841 × 1189 mm (1 m²). Large site plans and layouts.
- A1: 594 × 841 mm. The usual size for building and MEP drawings.
- A2: 420 × 594 mm. Details, smaller buildings.
- A3: 297 × 420 mm. Reduced prints, schematics, site copies.
- A4: 210 × 297 mm. Schedules, sketches and reports.
- Each size is half the one above, so an A1 printed on A3 is exactly half scale: write 'Scale 1:100 at A1' in the title block.
Common scales
- Site and key plans: 1:500, 1:1000, 1:2000 (1:1250 and 1:2500 are UK map scales, not ISO 5455).
- General arrangement and floor plans: 1:100, 1:200 (large buildings), 1:50 (plant rooms).
- Sections and enlarged plans: 1:50, 1:20.
- Details: 1:10, 1:5, 1:2, 1:1.
- Schematics and single-line diagrams are usually 'not to scale' (NTS).
Use with this guide
Title Block Data & Sheet List
Title block data for every sheet; builds drawing numbers from their fields and flags duplicates
- How to use
- Sheet list
- Sheet list (SAMPLE)
Drawing Register & Transmittal Log
Every revision with status, LATEST / SUPERSEDED flags, and transmittals with overdue replies
- How to use
- Drawing register
- Transmittal log